We’ve all been there before. The drawings have all been released for construction. Materials were placed on order weeks ago. Many components have already been received. And then there is the big change! Maybe it is a revised piping spec that means changes in material grades affecting hundreds of components, or maybe it just the latest change in process conditions that requires revising a few line sizes. But either way, you have to account for the changes, cancel the materials that are no longer needed and get the right things on order in a hurry. Pull out a fresh box of highlighters, it’s going to be a long night.…..unless you have EDGE BOM or have IMAGE doing your engineering and design project! Plant EDGE now comes with a seat of EDGE BOM. At IMAGE we use EDGE BOM to help our customers manage changes efficiently and now you can those same great tools to help your clients as well.