•(1) 5000 BPD Condensate Stabilizer
•(4) Inlet Separator Packages •(1) Closed Drain Storage tank |
•(2) High Pressure Knock Out Drum Packages
•(1) Low Pressure Flare Knock Out Drum Package •(1) Coalescing Filter Separator Package |
Due to the unique hydrocarbon produced from this resource our Client needed a tailored engineering solution to meet the technical requirements necessary to transport the product to market. IMAGE CES was awarded this project after it had been started. The Client was behind schedule and needed significant assistance in developing the specifications and P&ID’s. Due to the complexity of multiple Companies working on the project, management of change and data dissemination was critical to the recovery plan.
By using EDGE 360 IMAGE CES was able to recover the project by providing Engineering support, rapid design turn-around, and management of change to all partners in the project to make delivery. IMAGE CES played a key role in the recovery phase of the project through the speed and design expertise provided to our Client. IMAGE CES completed the designs and was able to deliver the project in the time frame the Client promised.
By using EDGE 360 IMAGE CES was able to recover the project by providing Engineering support, rapid design turn-around, and management of change to all partners in the project to make delivery. IMAGE CES played a key role in the recovery phase of the project through the speed and design expertise provided to our Client. IMAGE CES completed the designs and was able to deliver the project in the time frame the Client promised.