•(16) 2500 HP Multi-Phase Pump Skids
•Maloob B platform- (6) Units
•ZAPP B platform- (5) Units
•ZAPP D platform- (5) Units
The Client had existing assets (platforms) that needed to be modified to provide an artificial lift / product transport pumping station module. IMAGE CES had to design the modules to fit in the allocated space available while meeting the pumps operating parameters. Furthermore the platforms had stringent HSE / Operational access requirements that further complicated the design. IMAGE CES delivered a package that met these constraints efficiently and effectively.
The team assigned to the project was an international group that each leveraged EDGE 360 to bring their expertise into the design. EDGE 360 allowed the engineering team to function greater than the sum of its parts and in turn allowed the package’s capabilities to be fully realized. IMAGE CES delivered the project in 10 weeks to fulfill the reduced fabrication schedule.
•Maloob B platform- (6) Units
•ZAPP B platform- (5) Units
•ZAPP D platform- (5) Units
The Client had existing assets (platforms) that needed to be modified to provide an artificial lift / product transport pumping station module. IMAGE CES had to design the modules to fit in the allocated space available while meeting the pumps operating parameters. Furthermore the platforms had stringent HSE / Operational access requirements that further complicated the design. IMAGE CES delivered a package that met these constraints efficiently and effectively.
The team assigned to the project was an international group that each leveraged EDGE 360 to bring their expertise into the design. EDGE 360 allowed the engineering team to function greater than the sum of its parts and in turn allowed the package’s capabilities to be fully realized. IMAGE CES delivered the project in 10 weeks to fulfill the reduced fabrication schedule.